Skip to content

BOM sourcing

One BOM, checked line by line

Send the file. Every line gets an answer — available, alternative, or not sourceable — with the market position and the packing stated. No line is quietly dropped to make the quote look complete.

Per lineanswer, not a bundle price
1 dayfirst response, short BOMs faster
37categories in scope
1consolidated shipment

Why a BOM quote from the market looks different

A distributor answers from a warehouse feed: in stock, out of stock, next shipment. The Huaqiangbei market answers differently — a part can exist in twenty booths, in four different date codes, in packs of 500 and reels of 4,000, at prices that differ by 30%. The honest answer is not a single number; it is a position with the reason attached.

That is what we send back. Each line comes back marked one of three ways:

  • Available — we saw the quantity
  • Alternative — the exact part is not there, and here is what changes
  • Not sourceable — with the reason: discontinued, controlled, or simply absent

Lines are never silently substituted, because a substituted line is the one that fails incoming inspection three weeks later.

What we need from the file

Part number, manufacturer, quantity, and the acceptance criteria that matter to you:

  • Date code window
  • AEC qualification
  • Brand restriction
  • RoHS or REACH documentation
  • Pack preference

If the file has none of that, we will ask — once, in a list — rather than guessing on twenty lines.

What happens when a line is obsolete

Obsolete is where the market is genuinely useful. Often the part exists as old stock with a usable date code, or as a last-time buy held by a broker.

We will tell you which it is, and we will not present decade-old stock as current production. If the honest answer is “redesign the line”, that is the answer you get.

Pricing and what is not included

The quote is per line, in USD by default, with the Incoterm stated.

Freight, inspection beyond the standard check, and programming or re-taping are quoted as separate lines so you can see what they cost rather than finding them inside a unit price.

Nothing is added after the order is confirmed unless you ask for it.

Send the requirement

A spreadsheet, a PDF, or a pasted list. If a line is unclear we will ask rather than assume.

Paste the BOM as text. If it is a file, send it on WhatsApp after submitting.

We use your details only to answer this enquiry — see the privacy policy. Prefer chat? WhatsApp · chao.open@gmail.com

Coverage

Where a BOM usually gets stuck

The three lines that cause most of the delay in a sourcing project, and what we do about each.

Obsolete and last-time buy

The part is gone from distribution but exists in the market as old stock. We check the date code and say whether it is usable, instead of shipping it and hoping.

Mixed-pack quantities

You need 1,200 pieces; the market has a 4,000-piece reel. We quote the full reel, the cut-tape price, and the honest per-piece difference, so the decision is yours.

Counterfeit exposure

High-value ICs and power devices are where re-marked parts appear. Marking and package checks are standard; lab verification is quoted when the line justifies it.

Process

From file to carton

The same four steps every time, so you know what to expect on a repeat order.

Full process detail
  1. File review

    We check completeness and flag lines that need clarification before any booth visit.

  2. Market check

    Per-line checks across the relevant booths; brand, date code and pack quantity recorded.

  3. Quote and confirmation

    A line-by-line answer with alternatives marked, valid for the stated period.

  4. Buy, inspect, consolidate

    Purchase only after your confirmation, inspection before sealing, one shipment out.

Questions

BOM sourcing, in practice

What is the minimum order?

There is no fixed minimum for a first enquiry, and prototype quantities are normal. Below a certain value the freight dominates the cost, so we will say when consolidating with a future order makes more sense than shipping now.

Can you buy from my approved vendor list only?

Yes. Send the AVL and we will restrict the search to it. If the approved brand is not available, you get "not sourceable" rather than an unapproved substitute.

Do you charge for quoting?

No for standard sourcing. Lab testing, programming, re-taping and similar services are quoted separately because they carry a real cost.

How long is a quote valid?

The quote states its validity — usually a few days on fast-moving lines. Market prices and availability move, so a quote held for a month is a guess, not an offer.

What if a line fails inspection?

It is replaced or removed and refunded before shipping. Finding a problem in Shenzhen is cheap; finding it at your assembly line is not.

Next step

Send the file. Get a line-by-line answer.

Short BOMs usually come back the same day during Shenzhen hours; larger files take a little longer because every line is checked.