Skip to content

Signal desk

What the market looks like this week

A signal is a dated observation from the floor: this family is tight, firm or loose, and this is the lead-time band we saw. It tells you where to plan, not what is reserved for you.

16signals on record
Mon–Satmarket checks, GMT+8
Per linere-confirmed at quotation
37categories covered
Sample data. Sample entries: these rows show the format of the desk while live records are being entered. Availability is illustrative and always re-confirmed at quotation.
Part / family Cluster Direction Lead-time band Verified Note
GRM155R71C104KA88D Passives Tight 2–4 days 2026-11-19 Consumer-grade reels moved fast after the November build cycle. 50 V parts are being quoted as 16 V equivalents with a price step.
CC0603KRX7R9BB104 Passives Loose next day 2026-11-19 Multiple booths holding full reels. No premium over the 0402 size, which is unusual and worth taking advantage of now.
TYPE-C-31-M-12 Interconnect & Electromechanical Tight 4–7 days 2026-11-19 16-pin mid-mount is the constrained format this month. 24-pin full-featured parts are easier. Pin count and mounting style both matter.
AO3400A Power & Discrete Firm 2–4 days 2026-11-18 High-run commodity part. Watch for re-marked copies at the low end of the price range; we buy only from booths we can return to.
LM358DR Integrated Circuits Loose next day 2026-11-18 Deep commodity stock across several brands. Pin-compatible clones are common; if the design needs TI silicon, say so in the enquiry.
T491D107K016AT Passives Firm 3–5 days 2026-11-17 Polymer alternatives are being pushed at a small premium. Genuine KEMET is available but date codes cluster in 2024.
MAX485ESA Integrated Circuits Firm 3–5 days 2026-11-16 Genuine parts are available but the price spread between booths is wide enough to be a warning sign on the cheapest quotes.
X49SM8MSD2SC Passives Loose next day 2026-11-15 Commodity line, no supply pressure. Load capacitance is the usual sourcing mistake: 20 pF and 12 pF are not interchangeable in a given oscillator circuit.
SMAJ5.0A Passives Firm 3–4 days 2026-11-14 Littelfuse and equivalent brands both on the floor. Buyers are increasingly asking for AEC-Q101 parts, which are a different line entirely.
IKW40N65H5 Power & Discrete Tight order-in 4–6 weeks 2026-11-13 Genuine Infineon is not sitting on shelves. Counterfeit risk on this family is real, so we quote authorised distribution or nothing.
AT24C256C-SSHL-T Integrated Circuits Loose 2–3 days 2026-11-12 Easy line. Microchip and ST equivalents both on the floor; check the temperature grade before substituting.
PZ254-2-10-WS Interconnect & Electromechanical Loose next day 2026-11-11 Commodity. Gold flash versus gold plated is the only real decision, and it changes the price by a factor, not a percentage.
SHT30-DIS Sensors & Modules Firm 5–8 days 2026-11-10 Sensirion stock is thin and being quoted with longer validity than usual. Counterfeit reels of this family circulate; buy on traceable supply.
ACS712ELCTR-20A-T Sensors & Modules Firm 4–6 days 2026-11-08 Allegro parts are available but not in every sensitivity variant. Specify the suffix; 05B, 20A and 30A are different lines.
PCB-2L-FR4-1.6 PCB & Substrates Loose 3–4 working days 2026-11-06 Fabrication capacity in Shenzhen is abundant; the constraint is your stack-up review, not the factory. Impedance control adds a day.
JST-XH-4P-300 Wire, Thermal & Mechanical Firm order-in 10–14 days 2026-11-04 Crimping is done to order, so the first article matters more than the lead time. Send a drawing or a sample, not a description.

Standing notes

How each cluster behaves, independent of the week

These are structural statements about the market: which slices are deep, which are thin, and where a substitution usually goes wrong.

General-purpose 0402–0603 MLCC, 1% thick-film resistors and 8 MHz crystals are the deepest part of the market: dozens of booths hold reels at any hour. High-voltage, AEC-Q200 and precision tolerance parts are thinner and usually need a day or two to assemble.

9 categories in this cluster →

Low-voltage MOSFETs in SO-8 and DFN packages move constantly. High-current, high-voltage and automotive-grade devices are order-in: expect brand and date-code checks before anything is confirmed.

6 categories in this cluster →

Commodity logic, op-amps and LDOs are easy to find in genuine stock. Regulators and interface ICs are where counterfeits concentrate, so every order goes through marking and date-code inspection before it ships.

6 categories in this cluster →

Headers, USB-C receptacles and 5.08 mm terminal blocks are stocked by the reel and by the box. Brand-name relays and sealed switches depend on the series — always confirm the exact suffix, because the same family can differ by coil voltage and contact rating.

6 categories in this cluster →

This is a production service rather than a shelf: quoting depends on layer count, finish, impedance control and panel utilisation. Lead time is quoted per project and is not a stock figure.

2 categories in this cluster →

How to read a signal

Tight

Fewer booths hold the part than usual, or the packs on offer are smaller than the quantity you need. Expect a longer confirmation and a wider price spread between sellers. Plan for alternatives.

Firm

Availability is normal and prices are holding. The part can usually be assembled within the stated band, though the exact quantity still has to be confirmed.

Loose

More supply than demand: multiple booths hold the part and packs are complete. This is where a buyer has room to negotiate and where lead time is shortest.

Why the date matters

Huaqiangbei availability changes in days, not quarters. A signal without a date is a story, not information — which is why every row carries the date it was checked.

Get the weekly note

One email a week: what moved, what tightened, and which categories are worth buying now rather than next month.

No list sharing. Unsubscribe by replying to any note.

Ask about a specific part

A signal is market-level. For your exact part number, send it and we will check the booths directly.

Request a quote

Next step

Stop guessing at lead times.

Send the parts you need and we will tell you what the market can actually support this week.