Passives
Aluminium Electrolytic Capacitors
Radial, SMD and snap-in aluminium electrolytics from 1 µF to tens of thousands of µF, with lifetime and ripple current checked before quoting.
Typical specifications
Ranges we routinely source in this category. They describe the window, not a single part — the exact value is fixed by the datasheet you specify.
| Parameter | Range we source |
|---|---|
| Mounting | Radial through-hole, SMD (V-chip), snap-in, screw terminal |
| Capacitance | 1 µF – 100,000 µF |
| Voltage | 6.3 V – 450 V |
| Temperature | 85 °C and 105 °C series; 125 °C on selected series |
| Endurance | 1,000 – 12,000 hours at rated temperature |
| Key parameters | Ripple current, ESR, leakage current, lead spacing |
Where it is used
Typical applications we quote for. If your use case needs a tighter parameter than the list suggests, say so at quotation — it changes which suppliers are viable.
- Switch-mode power supply input and output
- Motor drive DC link
- Audio amplifier rails
- Industrial inverter smoothing
- Legacy board repair
Part numbers on the desk
Specific parts we have looked at recently. Availability is re-confirmed at quotation; the note is what we saw, not a reservation.
| Part number | Brand | Package | MOQ | Availability |
|---|---|---|---|---|
| EEU-FR1H101 | Panasonic | Radial 100 µF 50 V | 200 pcs | Seen in market |
Questions buyers ask about Aluminium Electrolytic
Can you supply obsolete series?
Often, yes — the market holds old stock for repair demand. We check date code first and will reject material that has been sitting long enough for the electrolyte to be a risk, even if the seller calls it new.
Do you test before shipping?
Capacitance, ESR and leakage are checked on sampled lines for larger orders. Full incoming inspection reports are available on request; tell us at quotation so the test cost is included rather than added later.
What is the difference between the 85 °C and 105 °C price?
The 105 °C long-life series typically costs more and is the correct choice for switching supplies. We will quote both so you can see the gap instead of assuming one is a bargain.
More in Passives
Next step
Send the part number. We will check the booths.
One line or a full BOM — the answer comes back per line, with the market position stated rather than implied.